The nature of our industry means that each project is different and requires detailed scoping and planning. McAuliffe are expert in managing the complex legal and technical requirements and relationships with stakeholders including clients, regulatory authorities and local residents who may be affected by the operation.

For more information about our services, please call 01902 354400 or contact us.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Location Key Highlights

Former Brewery
Cape Hill
Birmingham

Bespoke GMP Contract

Value £2.8 million

  • Extensive asbestos removal
  • Removal of 5000 tonnes of steel
  • Breaking out and processing of 140,000 tonnes of concrete
  • Ex-situ bio-remediation of 10,000m3 of heavily contaminated soil
  • Import and place over 250,000 tonnes of fill material to engineered specification

Former Industrial Works
City Wharf
Lichfield

ICE Design and Build Contract

Value £0.85 million

  • Stabilised 20,000 tonnes of heavy diesel contaminated soil.
  • Dealt with 800 tonnes of asbestos contamination
  • Managed 3,600 tonnes of PCB contaminated soils
  • Breaking out and processing of 20,000 tonnes of slabs and foundations

Pigment Works
Deanshangar
Milton Keynes

Bespoke GMP Contract

Value £1.2 million

  • Removal of 30,000 tonnes of below ground structures
  • Importation of 70,000 tonnes of clean cover material.
  • Removal of culvert and replacing with architect designed open brook landscaped feature through village

Portland Gas Storage 
Portland
Dorset

Value £0.25 million

  • Breaking out and processing of 15,000 tonnes concrete
  • Selection sorting and screening of 40,000 tonnes waste material
  • Asbestos decontamination works

Former Car Parts and Manufacturing site
Dunstable

NEC Design and build

Value £1m

  • Produce Groundwater Risk Assessment and Remediation Strategy: agree with regulators
  • Break out and process 40,000 tonnes of concrete into 6F2 and 6F1
  • Excavate and treat 13,000 tonnes of heavy contamination to agreed targets