Here you can find a collection of the kind of projects we’ve worked on recently. But if you can’t see a project here that’s like yours, it doesn’t mean we can’t handle it.

We can take any project from start to completion, regardless of size, time-scale or complexity.

McAuliffe and its specialist remediation arm, Geostream UK, were tasked with delivering a complete remediation and enabling works package at a large former industrial site. This was in preparation for 160 new homes for private rental.

View case study

McAuliffe and its specialist remediation arm, GeoStream UK, were contracted to carry out an extensive remediation and earthworks programme on a 6.6 Ha site in Nottingham in preparation for the construction of 171 new homes.

View case study

McAuliffe was tasked with remediating the 4.4ha site of the former Ever Ready battery factory, Telford, to prepare for 152 new homes.

View case study

Transforming a 46,000 sq. ft. site of a former plant yard ready for a retirement housing development.

View case study

McAuliffe was contracted to remediate the derelict site of the former council estate in central London, delivering an engineered development platform to a bespoke design.

View case study

McAuliffe was contracted to turn a former 10 unit industrial estate into a fully engineered development platform for construction of flats and low rise housing.

View case study

McAuliffe was tasked with the reclamation of Altrincham hospital's 19th Century façade, whilst demolishing the existing building.

View case study

Transforming the site of a former hospital into a viable development platform for the construction of 103 apartments and houses.

View case study

Transforming a sloping town centre site into a viable development platform for construction of an Extra Care Facility.

View case study

A full materials management plan assessment and cut and fill volumetric eliminated off-site disposal by accommodating drainage and construction arisings, as well as an advanced demolition and asbestos removal phase to remove old fabricating buildings and cemented silos.

View case study

Ground improvement and remediation of the 60 acre former site of the largest cable factory in the world, preparing a ‘blank canvas’ for 650 new homes and a £5m retail unit.

View case study

GeoStream UK, part of contamination and ground remediation specialist McAuliffe Group, has provided a cost-effective in-situ solution for the treatment of contaminated groundwater on the site of new ASDA store in Bridge St, Portadown in Northern Ireland.

View case study

The notorious Tipton level Railway crossing had for years frustrated all those who used it. During peak times the barrier was often down for 45 mins out of every hour resulting in delays and tail‐backs for motorists and local businesses.

View case study

A remediation strategy with key target values was jointly prepared by McAuliffe and WSP for submission to the Regulators. This lead to the treatment and re‐use of 10,000m3 of hydrocarbon contaminated soils on site.

View case study

The expansion of a large scale waste processing and composting facility, that handles approximately 80,000 tonnes of municipal waste per annum, required an area containing a large fly tipped mound (40,000tonnes) to be brought back into use to allow for the construction of a second treatment hall.

View case study